To see where each project is located, visit
the project map.
http://www.portlandonline.com/transportation/index.cfm?c=46219&a=179054
______________________________________________________
Project List
Total Project Cost
South Portal, Phase I & II
$57,330,684.00
Moody/Bond Ave, SW (Sheridan to Gibbs):
$18,834,515.00
South Light Rail
$4,960,110.00
Lloyd District Access Improvements
$998,243.00
Central Eastside Bridgehead
$2,148,963.00
Burnside/Couch, East - Phase I & II
$24,946,554.00
Burnside/Couch, West - Phase I & II
$75,895,353.00
Eastside Streetcar Phase I & II, NE/SE
$7,300,000.00
NW Flanders (Steel Br. to Westover): Bicycle
Facility
$2,392,336.00
Going, N (Interstate - Greeley): ITS
$950,024.00
Lombard, N Multi-modal Improvements
$34,517,517.00
Lombard at Columbia Slough, N: Overcrossing
$2,328,040.00
Burgard-Lombard, N: Street Improvements.
$8,940,604.00
Argyle on the Hill, N Columbia to N Denver Ave.
$11,773,032.00
47th, NE (Columbia - Cornfoot):Roadway &
Intersection Improvements
$5,541,678.00
Alderwood/Cornfoot Road Intersection
$1,333,000.00
NE Cully Blvd
$5,255,633.00
NE Columbia Blvd/MLK
$1,029,430.00
Twenties Bikeway
$1,837,572.00
(Marine Drive, 6th to 185th) Bikeway
$2,130,835.00
Seventies Greenstreet and Bikeway,(Killingsworth
- Clatsop)
$4,227,056.00
NE/SE 122nd (NE Airport Way to SE Powell Blvd)
ITS
$515,703.00
NE Airport Way (I-205 to NE 158th Avenue) ITS
$278,251.00
Gateway Regional Center, Local and Collector
Streets
$32,648,540.00
NE Glisan St,(122nd - City Limits): Multi-modal
Improvements $3,100,241.00
NE Airport Way & 122nd Intersection
$1,053,905.00
NW Burnside at Skyline Road
$1,850,716.00
Skyline, NW (Hwy 26 - City Limits): Bikeway
$8,088,812.00
Yeon/St. Helens, NW: ITS
$885,499.00
Division Fastlink (SE Grand to 122nd Avenue)
$11,180,220.00
Fifties Bikeway, NE/SE (Tillamook to Woodstock)
$1,595,049.00
SE Flavel Drive
$7,294,088.00
Foster Fastlink (SE Powell to 90th Avenue)
$745,368.00
122nd, SE (at Morrison): Pedestrian Overcrossing
$78,641.00
SE 136th Avenue (Division to Powell) Bikeway
$6,090,590.00
SE Barbara Welch Road
$20,191,557.00
Foster Rd, SE (136th - Jenne):
$16,963,856.00
Powellhurst/Gilbert Pedestrian Improvements
$1,473,288.00
SW Capitol Highway
$9,613,958.00
SW Garden Home/Multnomah
$1,931,033.00
SW Hamilton Street
$12,420,360.00
Macadam, SW (Bancroft - Sellwood Br): ITS
$401,794.00
Stephenson, SW (Boones Ferry - 35th): Multi-modal
Improvements $1,438,592.00
Total $414,511,240.00
-------------More details below--------
Project List Total Project Cost
Transportation System Plan Project Number 20007
South Waterfront
South Portal, Phase I & II
Improve SW Bancroft, SW Moody and SW Bond Streets.
$57,330,684.00
Transportation System Plan Project Number 20009
South Waterfront
Moody/Bond Ave, SW (Sheridan to Gibbs):
Street Improvements
Five lane street improvement from SW River Parkway to SW Gibbs Street.
$18,834,515.00
Transportation System Plan Project Number 20031
South Waterfront
South Light Rail
City street and sidewalk improvements to support the addition of Light
Rail along
SW Lincoln Street and SW River Parkway.
$4,960,110.00
Transportation System Plan Project Number 20033
Central City
Lloyd District Access Improvements
Add traffic signals and improve intersections at NE 2nd and Broadway
and NE 2nd and Weidler Streets.
$998,243.00
Transportation System Plan Project Number 20037
Central City
Central Eastside Bridgehead
Improve pedestrian and bicycle access to bridge approaches.
$2,148,963.00
Transportation System Plan Project Number 20088 20090
Central City
Burnside/Couch, East - Phase I
& II
Implements a one-way couplet design including new traffic signals,
widened
sidewalks, curb extensions, bike lanes on-street parking and street
trees.
$24,946,554.00
Transportation System Plan Project Number 20089
20091
Central City
Burnside/Couch, West - Phase
I & II
Implements a one-way couplet design including new traffic signals,
widened
sidewalks, curb extensions, bike lanes on-street parking and street
trees.
$75,895,353.00
Transportation System Plan Project Number 20084 20085
Central City
Eastside Streetcar Phase I &
II, NE/SE
Construct streetcar from NW Lovejoy/10th to NE 7th / Oregon.
Construct streetcar from NE Oregon to SE Water.
$7,300,000.00
Transportation System Plan Project Number 20097
Central City & NW Portland
NW Flanders (Steel Bridge to Westover):
Bicycle Facility
Develop a bicycle and pedestrian crossing of I-405.
$2,392,336.00
Transportation System Plan Project Number 30015
N Portland
Going, N (Interstate - Greeley):
ITS
Install needed ITS infrastructure (communication network, new traffic
controllers, CCTV cameras, and vehicle /pedestrian detectors). These
ITS devices allow the City to provide more efficient and safe operation
of our traffic signal system.
$950,024.00
Transportation System Plan Project Number 30036
N Portland
Lombard, N (Rivergate - to T-6):
Multi-modal Improvements
Widen N Lombard to include two travel lanes, a non-continuous center
turn
lane, medians, bike lanes, sidewalks and planting strips.
$34,517,517.00
Transportation System Plan Project Number 30067
N Portland
Lombard at Columbia Slough, N:
Overcrossing
Add sidewalk and bike lanes to strengthened bridge.
$2,328,040.00
Transportation System Plan Project Number 30080
N Portland
Burgard-Lombard, N: Street Improvements
From N Terminal Park Road to N Columbia Boulevard. Widen street to
include 2 12-foot travel lanes, continuous left turn lane, bike lanes
and sidewalk.
$8,940,604.00
Transportation System Plan Project Number 30081
N Portland
Argyle on the Hill, N Columbia
to N Denver Ave
New N Argyle street connection, west of I-5.
$11,773,032.00
Transportation System Plan Project Number 40009
NE Portland
47th, NE (Columbia - Cornfoot):Roadway
& Intersection Improvements
Widen and reconfigure intersections to better facilitate truck turning
movements
to the cargo area located within the airport area. Project includes
sidewalk and
bikeway improvements.
$5,541,678.00
Transportation System Plan Project Number 40035
NE Portland
Alderwood/Cornfoot Road Intersection
Add signal and improve turn lanes at Alderwood/Cornfoot Road to improve
safety, circulation, and access to PDX and Portland International Center
properties.
$1,333,000.00
Transportation System Plan Project Number 40037
NE Portland
NE Cully Blvd
Improve NE Cully from NE Prescott to NE Killingsworth
$5,255,633.00
Transportation System Plan Project Number 40061
NE Portland
NE Columbia Blvd/MLK
Intersection and signalization improvements with right turn lane
$1,029,430.00
Transportation System Plan Project Number 40074
NE & SE Portland
Twenties Bikeway
Design and implement a bikeway using bike boulevards and bike lanes.
$1,837,572.00
Transportation System Plan Project Number 40080
NE Portland
Marine Dr, NE (6th - 33rd & Gantenbein - Vancouver Way): Bikeway
(Marine Drive, 6th to 185th)
Retrofit bike lanes to existing street and complete off-street paths
in missing locations.
$2,130,835.00
Transportation System Plan Project Number 40082 70052
NE & SE Portland
Seventies Greenstreet and Bikeway,(Killingsworth
- Clatsop)
Develop a combined pedestrian greenway and bike boulevard including
crossing
improvements at arterials.
$4,227,056.00
Transportation System Plan Project Number 50005
Far NE Portland
NE/SE 122nd (NE Airport Way
to SE Powell Blvd) ITS
Install needed ITS infrastructure (communication network, new traffic
controllers,
CCTV cameras, and vehicle /pedestrian detectors). These ITS devices
allow the
City to provide more efficient and safe operation of our traffic signal
system.
$515,703.00
Transportation System Plan Project Number 50016
Far NE Portland
NE Airport Way (I-205 to NE
158th Avenue) ITS
Install needed ITS infrastructure (communication network, new traffic
controllers,
CCTV cameras, and vehicle /pedestrian detectors). These ITS devices
allow the
City to provide more efficient and safe operation of our traffic signal
system.
$278,251.00
Transportation System Plan Project Number 50014 50018
Far NE Portland
Gateway Regional Center, Local
and Collector Streets
High priority local and collector street and pedestrian improvements
in the Gateway Regional Center.
$32,648,540.00
Transportation System Plan Project Number 50025
Far NE Portland
NE Glisan St,(122nd - City Limits):
Multi-modal Improvements
Infill missing sidewalk, add curb ramps at corner, add 3 median island
crossings, and add a signal.
$3,100,241.00
Transportation System Plan Project Number 50040
Far NE Portland
NE Airport Way & 122nd Intersection
Add northbound left turn lane, modify traffic signal, and reconstruct
island.
$1,053,905.00
Transportation System Plan Project Number 60006
NW Portland
NW Burnside at Skyline Road
Intersection improvements
$1,850,716.00
Transportation System Plan Project Number 60015
NW Portland
Skyline, NW (Hwy 26 - City Limits): Bikeway
Widen existing 22' of pavement to 32', and add 2' shoulders adjacent
to lanes.
$8,088,812.00
Transportation System Plan Project Number 60023
NW Portland
Yeon/St. Helens, NW: ITS
Install needed ITS infrastructure (communication network, new traffic
controllers, CCTV cameras, and vehicle /pedestrian detectors). These
ITS
devices allow the City to provide more efficient and safe operation
of our
traffic signal system.
$885,499.00
Transportation System Plan Project Number 70015
SE Portland
Division Fastlink (SE Grand
to 122nd Avenue)
This project will install new signals, lighting, and sidewalks to accommodate
improved Tri-Met bus service. The length of the project is about 33,000
feet.
$11,180,220.00
Transportation System Plan Project Number 70018
SE Portland
Fifties Bikeway, NE/SE (Tillamook
to Woodstock)
Curb extensions, median refuges, signal modifications, and striping
changes
to create a north-south bicycle boulevard, along various interconnected
portions of 52nd -57th streets between NE Thompson and SE Woodstock
Blvd.
$1,595,049.00
Transportation System Plan Project Number 70019
SE Portland
SE Flavel Drive
Fully improve street from SE 45th to Clatsop Street with travel lanes,
curbs,
swales, sidewalks, and some bike lanes.
$7,294,088.00
Transportation System Plan Project Number 70021
SE Portland
Foster Fastlink (SE Powell to
90th Avenue)
Improve bus stops and pedestrian crossings.
$745,368.00
Transportation System Plan Project Number 80003
Far SE Portland
122nd, SE (at Morrison): Pedestrian
Overcrossing
Provide an at-grade improved pedestrian crossing on SE 122nd Avenue.
$78,641.00
Transportation System Plan Project Number 80004
Far SE Portland
SE 136th Avenue (Division to
Powell) Bikeway
Improve to 36' curb-to-curb with 2-13' traffic lanes and 2-5' bike
lanes;
6" curbs, 9' swales and 6' sidewalks on both sides.
$6,090,590.00
Transportation System Plan Project Number 80008
Far SE Portland
SE Barbara Welch Road
Widen existing 20' of pavement to new 34' roadway with travel lanes,
bike
lanes, curb and sidewalk.
$20,191,557.00
Transportation System Plan Project Number 80011
Far SE Portland
Foster Rd, SE (136th - Jenne):
Multi-modal
Improvements
Widen street to three lanes to provide two travel lanes, continuous
turn lane,
bike lanes, sidewalk, and drainage.
$16,963,856.00
Transportation System Plan Project Number 80016
Far SE Portland
Powellhurst/Gilbert Pedestrian
Improvements
Add sidewalks to SE 122nd Avenue between SE Harold Street and
SE Raymond Street.
$1,473,288.00
Transportation System Plan Project Number 90026
SW Portland
SW Capitol Highway
Improve SW Capitol Highway from SW Multnomah Boulevard to SW Taylors
Ferry Road per the 1996 Capitol Highway Plan.
$9,613,958.00
Transportation System Plan Project Number 90033
SW Portland
SW Garden Home/Multnomah
Improve and signalize the intersection at SW Garden Home Road and SW
Multnomah Boulevard.
$1,931,033.00
Transportation System Plan Project Number 90034
SW Portland
SW Hamilton Street
Improve SW Hamilton Street between SW Dosch and Scholls Ferry Road
$12,420,360.00
Transportation System Plan Project Number 90046
SW Portland
Macadam, SW (Bancroft - Sellwood
Br): ITS
Install needed ITS infrastructure (communication network, new traffic
controllers,
CCTV cameras, and vehicle /pedestrian detectors). These ITS devices
allow us to
provide more efficient and safe operation of our traffic signal system.
$401,794.00
Transportation System Plan Project Number 90062
SW Portland
Stephenson, SW (Boones Ferry
- 35th): Multi-modal Improvements
Improve and signalize the intersection at SW Stephenson and SW Boones
Ferry Road.
$1,438,592.00
Total $414,511,240.00
Minimum Qualifications (project meets all of the following):
1. Project includes a component
that adds capacity to the transportation system
2. Project is in the city Capital
Improvement Program, or the Regional Transportation Plan, or the 2040 Growth
Concept
3. Project is on a street classified
above local service, exclusive of regional traffic and transit ways
4. Project is located in an area
that is projected to add population and/or employment over the next ten
years
5. Project is not a maintenance
project
6. Project is not for purchase
of equipment/rolling stock, but may be for facilities supporting rolling
stock/equipment
Qualifying Criteria
Project supports one or more of the following City Comprehensive Plan, and economic development goals and objectives:
1. Accommodates increased density
and/or in-fill re/development
2. Reduces reliance on automobile
usage by increasing access to alternate modes of travel
3. Connects and supports 2040
Growth Concept land-use components
4. Improves transit connections
between employment centers and neighborhoods
5. Limits impacts of motor vehicles
on pedestrian, bike, and transit oriented areas
6. Reduces conflicts between
freight and non-freight uses
7. Facilitates the efficient
movement of goods and services in and out of Portland's major industrial
and commercial areas
8. Ensures access to intermodal
terminals and related distribution facilities
9. Improves circulation between
business districts